Therma South Inc. (TSI) Coal-Fired Power Plant Expansion (Phase II)

Apercu prepared the Environmental Performance Report and Management Plan (EPRMP) for the 345MW (Phase II) Circulating Fluidized Bed (CFB) Coal-Fired Power Plant Expansion that will be located in Barangay Binugao, Toril District, Davao City and Barangay Inawayan, Sta. Cruz, Davao del Sur. It will be situated adjacent to the existing 300MW (Phase I) Coal-Fired Power Plant. TSI acquired additional hectares for Phase II, resulting in a power complex of approximately 80 hectares.

The Public Consultations were held in the host barangays and were facilitated by Apercu in accordance with the Revised Procedural Manual Public Consultation Guidelines.

The ECC was issued on August 2014 by DENR-EMB Central Office.