An Environmental Impact Statement (EIS) report was prepared for the San Gabriel Avion 115MW Power Plant that is located in Barangay Bolbok, Batangas City. The power plant will use Aero-derivative Gas Turbine Technology.

The following baseline surveys and impact assessments were conducted for the project: geology and geomorphology, land use and classification, pedology, terrestrial ecology, hydrology and hydrogeology, water quality, air quality and noise, and environmental risk assessment. Public participation activities such as IEC campaigns, FGDs, Public Scoping and Public Consultation were undertaken during the study.

The ECC was issued on December 2013 by DENR-EMB Central Office.